{"id":6174,"date":"2022-06-17T10:32:15","date_gmt":"2022-06-17T08:32:15","guid":{"rendered":"https:\/\/www.centiel.com\/protecting-the-critical-power-for-production-at-envase-central\/"},"modified":"2023-02-28T10:45:17","modified_gmt":"2023-02-28T09:45:17","slug":"protecting-the-critical-power-for-production-at-envase-central","status":"publish","type":"post","link":"https:\/\/www.test2.centiel.com\/es\/protecting-the-critical-power-for-production-at-envase-central\/","title":{"rendered":"Protecting the Critical Power for Production at Envase Central"},"content":{"rendered":"<h3><strong>Segment<\/strong><\/h3>\n<p>Beverage Packaging Facility<\/p>\n<h3><strong>Challenge<\/strong><\/h3>\n<p>Voltage Fluctuations<\/p>\n<h3><strong>Results<\/strong><\/h3>\n<p>CumulusPower\u2122 now provides clean continuous power to Envase Central the provider of canning and packaging of soft drinks, based in Santiago, Chile.<\/p>\n<h3><strong>Power Protection Solution<\/strong><\/h3>\n<p>750kW CumulusPower\u2122 system populated with 13 x 60kW intelligent UPS modules, providing 15 minutes autonomy.<\/p>\n<h3><strong>Location<\/strong><\/h3>\n<p>Santiago, Chile<\/p>\n<h3><strong>Our Customer<\/strong><\/h3>\n<p>Centiel\u2019s local partner was invited to tender for the supply, installation, and maintenance of a UPS system to protect the power for a provider of canning and packaging of soft drinks for some of the world\u2019s leading house-hold name brands. Based in Santiago, Chile the Envase Central factory produces 75 products with the help of 157 team members for Vital Jugos S.A., Coca Cola. and Vital Aguas S.A.<\/p>\n<h3><strong>The Project<\/strong><\/h3>\n<p>To ensure clean, consistent power to support the significant number of electronic processes that make up the electrical network to power the production processes at the plant, Envase Central required a reliable UPS solution. The new UPS needed to mitigate large voltage fluctuations and prevent delays in production due to failure of electrical, electronic, and power components following power interruptions which decrease the effectiveness of the plant.<br \/>\nThe project was specified following analysis of the true consumption and management requirement of energy at the facility. A study of loads was carried out for the varying formats and conditions of the production line which includes electronics, power, motors and even furnaces as part of the same system.<\/p>\n<h3><strong>The Solution<\/strong><\/h3>\n<p>Centiel\u2019s industry leading 4th generation true modular UPS CumulusPower\u2122 known for its 99.9999999% (nine-nines) availability translating to just milliseconds of downtime per year was chosen as the best option to guarantee a continuous supply of power and voltage stability for the production processes. In addition, CumulusPower\u2122 now provides back-up power in the event of a complete power failure allowing a controlled shutdown of the production line without affecting the setup.<br \/>\nThe new Centiel CumulusPower\u2122 system and associated infrastructure designed to provide up to 780kW power, was installed in a UPS room at the production plant, designed by Centiel\u2019s local team of engineers. CumulusPower\u2122 is now supported by a lithium-ion battery bank and a precision climate system.<br \/>\nGerardo Lecuona, co-founder and sales director, Centiel explains: \u201cOur local partner presented a robust and reliable UPS solution. Thanks to its redundant architecture, high energy availability and simplicity when executing maintenance services, CumulusPower\u2122 was the most suitable option for the high-power demand and level of criticality of the industrial systems at the plant.<br \/>\n\u201cA further advantage of CumulusPower\u2122 is that the 13 x 60 kW autonomous modules making up the UPS, can operate with Lithium batteries without the need for invasive modifications, making it particularly straightforward to set up. Servicing is easy as each individual module can be evaluated or hot-safe- swapped without compromising the load or the system.<br \/>\n\u201cIn contrast to other systems which include fuses within modules, Centiel\u2019s superior design has been modified to include fuses external to the modules at a frame level. This means replacement takes seconds and can be completed by a member of staff who has undertaken first level response training. This significantly reduces mean time to repair (MTTR) as it removes the need for an engineer to attend and potentially put a system into bypass (depending on configuration) to remove modules and complete remedial works.\u201d<br \/>\nLecuona continues: \u201cThis project was completed in four weeks and represents the first installation of CumulusPower\u2122 to be supported by lithium-ion batteries in a production system or production plant anywhere in the world. As well as now providing a clean, stable source of power for Envase Central\u2019s critical production line, the 750 kW UPS will supply 15 minutes run-time in the event of a complete power failure, ensuring all electrical components are protected during any necessary shutdown.<br \/>\n\u201cAs trusted advisors, Centiel provide technical expertise to their clients across the globe to design the most robust, flexible and optimal UPS solutions available, supported by local engineers. We are proud to have CumulusPower\u2122 protecting the power at Envase Central ensuring the company\u2019s production line remains protected for the long term.\u201d<\/p>\n<p><a href=\"https:\/\/www.test2.centiel.com\/wp-content\/uploads\/2022\/06\/Centiel_CaseStudy_Chile_2022_WEB_EN.pdf\">Download pdf<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Segment Beverage Packaging Facility Challenge Voltage Fluctuations Results CumulusPower\u2122 now provides clean continuous power to Envase Central the provider of canning and packaging of soft drinks, based in Santiago, Chile. Power Protection Solution 750kW CumulusPower\u2122 system populated with 13 x 60kW intelligent UPS modules, providing 15 minutes autonomy. Location Santiago, Chile Our Customer Centiel\u2019s local [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":5502,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[422],"tags":[],"class_list":["post-6174","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-articulos-casos-de-estudio-e-documentacion-tecnica"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Protecting the Critical Power for Production at Envase Central - Centiel<\/title>\n<meta name=\"robots\" content=\"noindex, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<meta property=\"og:locale\" content=\"es_ES\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Protecting the Critical Power for Production at Envase Central - Centiel\" \/>\n<meta property=\"og:description\" content=\"Segment Beverage Packaging Facility Challenge Voltage Fluctuations Results CumulusPower\u2122 now provides clean continuous power to Envase Central the provider of canning and packaging of soft drinks, based in Santiago, Chile. Power Protection Solution 750kW CumulusPower\u2122 system populated with 13 x 60kW intelligent UPS modules, providing 15 minutes autonomy. Location Santiago, Chile Our Customer Centiel\u2019s local [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.test2.centiel.com\/es\/protecting-the-critical-power-for-production-at-envase-central\/\" \/>\n<meta property=\"og:site_name\" content=\"Centiel\" \/>\n<meta property=\"article:published_time\" content=\"2022-06-17T08:32:15+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-02-28T09:45:17+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.test2.centiel.com\/wp-content\/uploads\/2022\/06\/Centiel_CaseStudy_chile_2022.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"750\" \/>\n\t<meta property=\"og:image:height\" content=\"525\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"poliedro\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Escrito por\" \/>\n\t<meta name=\"twitter:data1\" content=\"poliedro\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tiempo de lectura\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.test2.centiel.com\\\/es\\\/protecting-the-critical-power-for-production-at-envase-central\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.test2.centiel.com\\\/es\\\/protecting-the-critical-power-for-production-at-envase-central\\\/\"},\"author\":{\"name\":\"poliedro\",\"@id\":\"https:\\\/\\\/www.test2.centiel.com\\\/es\\\/#\\\/schema\\\/person\\\/c6af9012df987cb2606f42b1c946fc0c\"},\"headline\":\"Protecting the Critical Power for Production at Envase Central\",\"datePublished\":\"2022-06-17T08:32:15+00:00\",\"dateModified\":\"2023-02-28T09:45:17+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.test2.centiel.com\\\/es\\\/protecting-the-critical-power-for-production-at-envase-central\\\/\"},\"wordCount\":688,\"publisher\":{\"@id\":\"https:\\\/\\\/www.test2.centiel.com\\\/es\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.test2.centiel.com\\\/es\\\/protecting-the-critical-power-for-production-at-envase-central\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.test2.centiel.com\\\/wp-content\\\/uploads\\\/2022\\\/06\\\/Centiel_CaseStudy_chile_2022.jpg\",\"articleSection\":[\"Art\u00edculos, casos de estudio e documentaci\u00f3n t\u00e9cnica\"],\"inLanguage\":\"es\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.test2.centiel.com\\\/es\\\/protecting-the-critical-power-for-production-at-envase-central\\\/\",\"url\":\"https:\\\/\\\/www.test2.centiel.com\\\/es\\\/protecting-the-critical-power-for-production-at-envase-central\\\/\",\"name\":\"Protecting the Critical Power for Production at Envase Central - Centiel\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.test2.centiel.com\\\/es\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.test2.centiel.com\\\/es\\\/protecting-the-critical-power-for-production-at-envase-central\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.test2.centiel.com\\\/es\\\/protecting-the-critical-power-for-production-at-envase-central\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.test2.centiel.com\\\/wp-content\\\/uploads\\\/2022\\\/06\\\/Centiel_CaseStudy_chile_2022.jpg\",\"datePublished\":\"2022-06-17T08:32:15+00:00\",\"dateModified\":\"2023-02-28T09:45:17+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.test2.centiel.com\\\/es\\\/protecting-the-critical-power-for-production-at-envase-central\\\/#breadcrumb\"},\"inLanguage\":\"es\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.test2.centiel.com\\\/es\\\/protecting-the-critical-power-for-production-at-envase-central\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/www.test2.centiel.com\\\/es\\\/protecting-the-critical-power-for-production-at-envase-central\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.test2.centiel.com\\\/wp-content\\\/uploads\\\/2022\\\/06\\\/Centiel_CaseStudy_chile_2022.jpg\",\"contentUrl\":\"https:\\\/\\\/www.test2.centiel.com\\\/wp-content\\\/uploads\\\/2022\\\/06\\\/Centiel_CaseStudy_chile_2022.jpg\",\"width\":750,\"height\":525},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.test2.centiel.com\\\/es\\\/protecting-the-critical-power-for-production-at-envase-central\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.test2.centiel.com\\\/es\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Protecting the Critical Power for Production at Envase Central\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.test2.centiel.com\\\/es\\\/#website\",\"url\":\"https:\\\/\\\/www.test2.centiel.com\\\/es\\\/\",\"name\":\"Centiel\",\"description\":\"Continuous Power Availability\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.test2.centiel.com\\\/es\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.test2.centiel.com\\\/es\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"es\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.test2.centiel.com\\\/es\\\/#organization\",\"name\":\"Centiel\",\"url\":\"https:\\\/\\\/www.test2.centiel.com\\\/es\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/www.test2.centiel.com\\\/es\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.test2.centiel.com\\\/wp-content\\\/uploads\\\/2023\\\/06\\\/centiel_logo_slogan_01_color_small.png\",\"contentUrl\":\"https:\\\/\\\/www.test2.centiel.com\\\/wp-content\\\/uploads\\\/2023\\\/06\\\/centiel_logo_slogan_01_color_small.png\",\"width\":276,\"height\":95,\"caption\":\"Centiel\"},\"image\":{\"@id\":\"https:\\\/\\\/www.test2.centiel.com\\\/es\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.test2.centiel.com\\\/es\\\/#\\\/schema\\\/person\\\/c6af9012df987cb2606f42b1c946fc0c\",\"name\":\"poliedro\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f3f8be0b2902e378287d6f71ad7972f1791fa9b1f7b29f1fb165e0c8966280f1?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f3f8be0b2902e378287d6f71ad7972f1791fa9b1f7b29f1fb165e0c8966280f1?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f3f8be0b2902e378287d6f71ad7972f1791fa9b1f7b29f1fb165e0c8966280f1?s=96&d=mm&r=g\",\"caption\":\"poliedro\"},\"url\":\"https:\\\/\\\/www.test2.centiel.com\\\/es\\\/author\\\/poliedroadmin\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Protecting the Critical Power for Production at Envase Central - Centiel","robots":{"index":"noindex","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"og_locale":"es_ES","og_type":"article","og_title":"Protecting the Critical Power for Production at Envase Central - Centiel","og_description":"Segment Beverage Packaging Facility Challenge Voltage Fluctuations Results CumulusPower\u2122 now provides clean continuous power to Envase Central the provider of canning and packaging of soft drinks, based in Santiago, Chile. Power Protection Solution 750kW CumulusPower\u2122 system populated with 13 x 60kW intelligent UPS modules, providing 15 minutes autonomy. Location Santiago, Chile Our Customer Centiel\u2019s local [&hellip;]","og_url":"https:\/\/www.test2.centiel.com\/es\/protecting-the-critical-power-for-production-at-envase-central\/","og_site_name":"Centiel","article_published_time":"2022-06-17T08:32:15+00:00","article_modified_time":"2023-02-28T09:45:17+00:00","og_image":[{"width":750,"height":525,"url":"https:\/\/www.test2.centiel.com\/wp-content\/uploads\/2022\/06\/Centiel_CaseStudy_chile_2022.jpg","type":"image\/jpeg"}],"author":"poliedro","twitter_card":"summary_large_image","twitter_misc":{"Escrito por":"poliedro","Tiempo de lectura":"3 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.test2.centiel.com\/es\/protecting-the-critical-power-for-production-at-envase-central\/#article","isPartOf":{"@id":"https:\/\/www.test2.centiel.com\/es\/protecting-the-critical-power-for-production-at-envase-central\/"},"author":{"name":"poliedro","@id":"https:\/\/www.test2.centiel.com\/es\/#\/schema\/person\/c6af9012df987cb2606f42b1c946fc0c"},"headline":"Protecting the Critical Power for Production at Envase Central","datePublished":"2022-06-17T08:32:15+00:00","dateModified":"2023-02-28T09:45:17+00:00","mainEntityOfPage":{"@id":"https:\/\/www.test2.centiel.com\/es\/protecting-the-critical-power-for-production-at-envase-central\/"},"wordCount":688,"publisher":{"@id":"https:\/\/www.test2.centiel.com\/es\/#organization"},"image":{"@id":"https:\/\/www.test2.centiel.com\/es\/protecting-the-critical-power-for-production-at-envase-central\/#primaryimage"},"thumbnailUrl":"https:\/\/www.test2.centiel.com\/wp-content\/uploads\/2022\/06\/Centiel_CaseStudy_chile_2022.jpg","articleSection":["Art\u00edculos, casos de estudio e documentaci\u00f3n t\u00e9cnica"],"inLanguage":"es"},{"@type":"WebPage","@id":"https:\/\/www.test2.centiel.com\/es\/protecting-the-critical-power-for-production-at-envase-central\/","url":"https:\/\/www.test2.centiel.com\/es\/protecting-the-critical-power-for-production-at-envase-central\/","name":"Protecting the Critical Power for Production at Envase Central - Centiel","isPartOf":{"@id":"https:\/\/www.test2.centiel.com\/es\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.test2.centiel.com\/es\/protecting-the-critical-power-for-production-at-envase-central\/#primaryimage"},"image":{"@id":"https:\/\/www.test2.centiel.com\/es\/protecting-the-critical-power-for-production-at-envase-central\/#primaryimage"},"thumbnailUrl":"https:\/\/www.test2.centiel.com\/wp-content\/uploads\/2022\/06\/Centiel_CaseStudy_chile_2022.jpg","datePublished":"2022-06-17T08:32:15+00:00","dateModified":"2023-02-28T09:45:17+00:00","breadcrumb":{"@id":"https:\/\/www.test2.centiel.com\/es\/protecting-the-critical-power-for-production-at-envase-central\/#breadcrumb"},"inLanguage":"es","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.test2.centiel.com\/es\/protecting-the-critical-power-for-production-at-envase-central\/"]}]},{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/www.test2.centiel.com\/es\/protecting-the-critical-power-for-production-at-envase-central\/#primaryimage","url":"https:\/\/www.test2.centiel.com\/wp-content\/uploads\/2022\/06\/Centiel_CaseStudy_chile_2022.jpg","contentUrl":"https:\/\/www.test2.centiel.com\/wp-content\/uploads\/2022\/06\/Centiel_CaseStudy_chile_2022.jpg","width":750,"height":525},{"@type":"BreadcrumbList","@id":"https:\/\/www.test2.centiel.com\/es\/protecting-the-critical-power-for-production-at-envase-central\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.test2.centiel.com\/es\/"},{"@type":"ListItem","position":2,"name":"Protecting the Critical Power for Production at Envase Central"}]},{"@type":"WebSite","@id":"https:\/\/www.test2.centiel.com\/es\/#website","url":"https:\/\/www.test2.centiel.com\/es\/","name":"Centiel","description":"Continuous Power Availability","publisher":{"@id":"https:\/\/www.test2.centiel.com\/es\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.test2.centiel.com\/es\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"es"},{"@type":"Organization","@id":"https:\/\/www.test2.centiel.com\/es\/#organization","name":"Centiel","url":"https:\/\/www.test2.centiel.com\/es\/","logo":{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/www.test2.centiel.com\/es\/#\/schema\/logo\/image\/","url":"https:\/\/www.test2.centiel.com\/wp-content\/uploads\/2023\/06\/centiel_logo_slogan_01_color_small.png","contentUrl":"https:\/\/www.test2.centiel.com\/wp-content\/uploads\/2023\/06\/centiel_logo_slogan_01_color_small.png","width":276,"height":95,"caption":"Centiel"},"image":{"@id":"https:\/\/www.test2.centiel.com\/es\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.test2.centiel.com\/es\/#\/schema\/person\/c6af9012df987cb2606f42b1c946fc0c","name":"poliedro","image":{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/secure.gravatar.com\/avatar\/f3f8be0b2902e378287d6f71ad7972f1791fa9b1f7b29f1fb165e0c8966280f1?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/f3f8be0b2902e378287d6f71ad7972f1791fa9b1f7b29f1fb165e0c8966280f1?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/f3f8be0b2902e378287d6f71ad7972f1791fa9b1f7b29f1fb165e0c8966280f1?s=96&d=mm&r=g","caption":"poliedro"},"url":"https:\/\/www.test2.centiel.com\/es\/author\/poliedroadmin\/"}]}},"_links":{"self":[{"href":"https:\/\/www.test2.centiel.com\/es\/wp-json\/wp\/v2\/posts\/6174","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.test2.centiel.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.test2.centiel.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.test2.centiel.com\/es\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.test2.centiel.com\/es\/wp-json\/wp\/v2\/comments?post=6174"}],"version-history":[{"count":1,"href":"https:\/\/www.test2.centiel.com\/es\/wp-json\/wp\/v2\/posts\/6174\/revisions"}],"predecessor-version":[{"id":6180,"href":"https:\/\/www.test2.centiel.com\/es\/wp-json\/wp\/v2\/posts\/6174\/revisions\/6180"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.test2.centiel.com\/es\/wp-json\/wp\/v2\/media\/5502"}],"wp:attachment":[{"href":"https:\/\/www.test2.centiel.com\/es\/wp-json\/wp\/v2\/media?parent=6174"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.test2.centiel.com\/es\/wp-json\/wp\/v2\/categories?post=6174"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.test2.centiel.com\/es\/wp-json\/wp\/v2\/tags?post=6174"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}